HOTEL INFRASTRUCTURE – VENEZUELA

Foto-principal-proyecto-IKIN

Información del Proyecto

  • Adaptation of the Electrical and Service Water System / Project of finishes and services / Structural reinforcement
  • 2019
  • General Hospitality
  • Venezuela
  • Infraestructure

Scope of the project

  1. Detail Engineering for the Adaptation of the Electrical System and the Hotel Service Water System.
  2. Partial supply of equipment and materials to be used in electrical installations.
  3. Inspection Service for civil and electrical works, to ensure the adequate technical execution of the
    Telecommunications System Adequacy project.
  4.  

Achievements

  1. Increase in accommodation capacity (32%) with 24 new rooms and a 500 m2 suite.
  2. Independence in the purchase of drinking water and ice.
  3. Improvement in the Telecommunications System (voice, data, TV, CCTV and telephony).
  4. Backup of 100% of the electrical capacity, with an autonomy of 6 continuous days.
  5. Improvements in all administrative and operational services of the hotel.
  6. Facilities for future expansion (construction of Spa, Bar and new Pool).
  7. Improvement of laundry, refrigerated food storage and pastry services.
Fotos secundarias_0002_Capa 1
Fotos secundarias_0001_Capa 2
Fotos secundarias_0000_Capa 3

Other hotel remodeling projects

Archivos

No hay archivos que mostrar.

Categorías

  • No hay categorías