IPC Expansion of Fuel Distribution Plant – Plantel «El Alto» Costa Rica

Fotos-principales-proyectos-El-Alto

Información del proyecto

  • IPC Expansion of Fuel Distribution Plant - Plantel "El Alto"
  • 2012
  • Refinadora Costarricense de Petróleo, S.A. - RECOPE
  • El Alto Campus, Costa Rica
  • Oil & Gas

Scope of the project

Engineering, procurement, construction, prefabrication, assembly, painting and testing of two API 650 tanks with Geodesic dome roof and floating aluminum cover, for storage of 40,000 MBLS of regular gasoline each.

Includes:

  • Recirculation pumping system, earth movement, tank foundations, concrete dams, interconnection of process pipes and fire protection system, lighting, instrumentation.
  • Equipment energization, testing, training and commissioning.
Two tanks
  • Two API 650 tanks with a nominal capacity of 40,000 BBLS of regular gasoline each.

Fotos secundarias proyecto El Alto_0002_Captura de pantalla 2023-04-25 a la(s) 3.20.30 p. m.
Fotos secundarias proyecto El Alto_0001_Captura de pantalla 2023-04-25 a la(s) 3.20.39 p. m.
Fotos secundarias proyecto El Alto_0000_Captura de pantalla 2023-04-25 a la(s) 3.20.52 p. m.

Archivos

No hay archivos que mostrar.

Categorías

  • No hay categorías