![Fotos-principales-proyectos-Vialidad Fotos-principales-proyectos-Vialidad](https://indigoenergyint.com/wp-content/uploads/2023/04/Fotos-principales-proyectos-Vialidad.jpg)
Project information
- Road and Construction Project double road Río Seco - Huarina
- ----- -----
- Administradora Boliviana de Carreteras (ABC)
- El Alto, Bolivia
- Infraestructure
Scope of the project
Construction of two circulation channels in each direction and shoulders, including 16 pedestrian walkways and 14 bridges, in addition to 130 drainages.
This road is the second Trunk of Bolivia, which communicates with Peru. The project included earthworks, paving, walkway structures, bridges, drainage and road markings for a 56 km length of road.
![Fotos secundarias proyectos Vialidad_0002_Capa 8 Fotos secundarias proyectos Vialidad_0002_Capa 8](https://indigoenergyint.com/wp-content/uploads/2023/04/Fotos-secundarias-proyectos-Vialidad_0002_Capa-8.jpg)
![Fotos secundarias proyectos Vialidad_0001_Capa 9 Fotos secundarias proyectos Vialidad_0001_Capa 9](https://indigoenergyint.com/wp-content/uploads/2023/04/Fotos-secundarias-proyectos-Vialidad_0001_Capa-9.jpg)
![Fotos secundarias proyectos Vialidad_0000_Capa 10 Fotos secundarias proyectos Vialidad_0000_Capa 10](https://indigoenergyint.com/wp-content/uploads/2023/04/Fotos-secundarias-proyectos-Vialidad_0000_Capa-10.jpg)