Indigo Energy International

Road and Construction Project double road Río Seco – Huarina

Fotos-principales-proyectos-Vialidad

Project information

  • Road and Construction Project double road Río Seco - Huarina
  • ----- -----
  • Administradora Boliviana de Carreteras (ABC)
  • El Alto, Bolivia
  • Infraestructure

Scope of the project

Construction of two circulation channels in each direction and shoulders, including 16 pedestrian walkways and 14 bridges, in addition to 130 drainages.

This road is the second Trunk of Bolivia, which communicates with Peru. The project included earthworks, paving, walkway structures, bridges, drainage and road markings for a 56 km length of road.

Fotos secundarias proyectos Vialidad_0002_Capa 8
Fotos secundarias proyectos Vialidad_0001_Capa 9
Fotos secundarias proyectos Vialidad_0000_Capa 10

Archivos

No hay archivos que mostrar.

Categorías

  • No hay categorías