IPC – «Josefa Camejo» Thermoelectric Generation Plant in the West

Foto planta Josefa Camejo

Information Project:

  • IPC - "Josefa Camejo" Thermoelectric Generation Plant in the West
  • 2006
  • National Electric Corporation – CORPOELEC
  • Paraguaná, Edo. Falcón, Venezuela
  • Energy
  • 450 MW

Scope of the project

Engineering, Procurement and Construction Project, developed in an area of ​​32 hectares, for the supply, transportation, installation and commissioning of three generation turbines of 150 MW each (on site), simple cycle and dual fuel system. It has the possibility of future installation of a combined cycle, expanding the installed capacity of the plant.

The Balance of Plant (BOP) covered the liquid fuel storage and treatment systems, gas compression and treatment, service air, instruments and drinking water. Likewise demineralized water systems, effluent collection and treatment, control and telecommunications, as well as service buildings, control room, administrative buildings, warehouse and maintenance workshop. It also included the training of personnel responsible for the operation and maintenance of the plant.

Impact

More than 200 users benefited from this project. The transmission network was expanded to take advantage of the energy generation at the Josefa Camejo thermoelectric plant.

Likewise, the improvement of the quality and reliability of the electrical service was achieved, and thus managed to satisfy the growth in electrical demand of the Paraguaná Refining Complex, Zona Franca, the communities of Falcón and the National Interconnected System.

Fotos-secundarias-proyectos-Josefa-Camejo_0002_FcTmLs5WAAAKqtk
Fotos-secundarias-proyectos-Josefa-Camejo_0001_FcTmSLRXwAEmxvP
Fotos-secundarias-proyectos-Josefa-Camejo_0000_PJC

Archivos

No hay archivos que mostrar.

Categorías

  • No hay categorías